top of page
Search

Season's Greetings from Stellar Forge! Including EOY Update

Writer: Michael Cantu
Michael Cantu
22 minutes ago
4 min read


Season's Greetings from all of us at Stellar Forge. As the year winds down, I want to wish you and your family a warm, joyful holiday season. Thank you for trusting us with your machines and for being part of what we're building together. It means more to our team than you know. — Michael


Below are some highlights for this year into the next couple of years on what's new and where we're headed:


2026 was the year Stellar Forge grew from a Kansas mining operator into a full power-and-compute platform, and every step of that growth was built to make your mining better.

As one of the first data center companies designed around sustainability from day one, Stellar Forge is proud that renewables make up a large share of our power. That environmentally conscious approach is what sets us apart, and it comes from a simple belief: we're all neighbors here, and we build like it.


To every miner who trusts us with their machines: thank you. Bitcoin had a lot of highs and lows this year, and so did the Kansas weather. Through all of it, your hashrate stayed our first job. Here's what we finished this year, what's coming in 2027, and why our work on AI data centers is good news for your mining. ETF adoption has accelerated for Bitcoin - which is a great clue for everyone!


What we delivered in 2026


  • ForgeSight went live across our campuses. ForgeSight is our own live IoT intelligence platform, and it is now a USPTO-registered trademark. It manages computing loads in real time, checks them against substation data, and supports or curtails load as the grid needs. That means tighter uptime and more accurate reporting on your machines.

  • We kept you hashing through the summer heat. When Kansas heat advisories hit, our team adjusted operations site by site to protect your equipment and keep it running.

  • Continuing our focus on zero water. Our closed-loop cooling design uses no water. It is approved for AMD, NVIDIA and TPU hardware, and it supports liquid cooling up to 250 kW per rack.

  • We marked another year of zero-water mining. We celebrated another anniversary of North America's first zero-water, closed-loop cooling system for mining, which has now run successfully for multiple years.

  • We got our Project Dry Ridge campus ready to build. Power studies are complete, building permits are approved, and the site is certified as a Qualified Data Center by the State of Kansas.

  • We grew our pipeline by more than 715 MW. We added over 715 MW of new capacity outlook to our design-build pipeline for 2027 and 2028.

  • We invested in our community. Under agreements signed this year, we additionally committed $1.4 million a year in local contributions tied to Project Dry Ridge, beyond everything we already invest in and donate to our community. We also helped fund a new museum and scholarships for college students. On top of that, we committed to hiring locally, accelerating 28 roles for this next year (with another 95 opening in 2027 and 2028), built workforce pathways, launched an online teachers' grant program with a new online application process that replaces our prior monthly paper process so teacher's get funding faster, and started a free educational video series on YouTube. It all comes back to one belief: Stellar Forge is built around people, and built for them. We have always made decisions with the collective in mind.


Why our AI work makes your mining stronger


Bitcoin mining and AI compute run on the same foundation: power, cooling, and people who know how to run both around the clock. Every AI campus we develop makes that foundation bigger and better for our mining customers.

  • More power under contract. Larger power agreements and new substation capacity give us more room to place and grow your fleet.

  • Better engineering. The cooling, electrical and monitoring work we build to AI data center standards carries straight into how we run and think about your miners.

  • A stronger, longer-lasting partner. A diversified Stellar Forge can keep investing in mining operations through every part of the Bitcoin cycle.


What's coming in 2027


For your mining experience

  • A new Stellar Forge Mining website. We're rebuilding stellarforgemining.com around the people who use it: miners, builders and tech enthusiasts.

  • A mobile app. A Stellar Forge Mining app is currently in development, so you'll soon be able to keep closer tabs on your operation from your phone.

  • More power options at our mining sites. We're evaluating new wind generation capacity at one of our mining sites to add additional clean, flexible power.

  • New ways to take part in mining. We're exploring a mining-as-a-service model that would let more people take part in Bitcoin mining without running their own hardware. More details will follow once it's ready.


For Zero Water Closed Loop AI data center builds

  • AI capacity at Project Dry Ridge. Substation and site construction will start in early 2027, with initial power available on site.

  • Project Dryland. Land, power and county approvals are moving forward on Project Dryland, a 245 MW campus designed again around our closed-loop, zero-water cooling.

  • Project Dry Draw. We're also adding Project Dry Draw to our pipeline, bringing more than 500 MW of additional potential power for 2028~.


Looking ahead together


Our goal for 2027 is simple: keep your machines running at the lowest cost and highest uptime in the market, and keep building the power and compute that the next generation of technology needs sustainably.


Want to add capacity, plan for next year, or hear about new offerings first? Reach our team at sales@stellarforgemining.com.


Thank you for mining with us. We appreciate everyone and for working together to create a great platform for everyone! Great appreciation for all of our teammates and partners as well that make everyday run smoothly.


Season's Greetings!


— Michael Cantu, Stellar Forge

 
 
bottom of page